March 2017

Site Cleared, QA done, almost there

Its been a good couple of weeks with the external facade completed, the bin removed and the builder’s toilet removed. Last Wednesday afternoon we spent 2 hours detailing issues with finish in our QA meeting with our SM. Most of those have now been addressed.

We’re now very close to being in our house!!

Continue reading “Site Cleared, QA done, almost there”

Advertisements

Oven is in and front downpipe

Yesterday the oven was installed and looks fantastic. The 900 width matches the 900mm cooktop and the combination of silver finish with the range hood above makes for a great combination.

Continue reading “Oven is in and front downpipe”

Garage door, toilets, range hood are in

This week progress slowed, as our SM negotiated multiple trades to come back.Externally we’re almost done with garage door and capping going on. Just need the porticos painted.

Our Roca The Gap toilets are in after a hickup where the inlet tap had to be moved from the side to the back which gives them a clean, modern, minimalist finish.

Continue reading “Garage door, toilets, range hood are in”