Today we’ve had great progress on the block. weve had the pipework and plumbing installed, which we were expecting, but plenty of bonuses we weren’t.

Along with the vast array of pipes now rising from our patch of dirt, is the meter box which is now providing power, to power the build.


Theres also the essentials like a portaloo and a bin. its great to see Metricon using a proper industrial bin that can easily be removed at the end of the build, rather than what other builders are doing with a cage built of mesh that puts the rubbish on display.

Advertisements